Howden Reservoir Masonry Dam Howden Reservoir from Derwent Reservoir
Howden Reservoir Masonry Dam
Howden Reservoir from Derwent Reservoir
Howden Reservoir Overflowing Wind sweeping spray back up the wall. Completed in 1912.
Howden Reservoir Overflowing
Wind sweeping spray back up the wall. Completed in 1912.
Howden Masonry Dam Howden Reservoir was designed by the Derwent Valley Water Board - Cheif Engineer - Edward Sandeman. Construction started in July 1901.
Howden Masonry Dam
Howden Reservoir was designed by the Derwent Valley Water Board - Cheif Engineer - Edward Sandeman.
Construction started in July 1901.
Howden Reservoir Entrance Howden Reservoir access to the top of the dam wall.
Howden Reservoir Entrance
Howden Reservoir access to the top of the dam wall.
Howden Reservoir is Full From Wiki Howden Reservoir is a Y-shaped reservoir, top one of the three in the Upper Derwent Valley, England. The western half of the reservoir lies in...
Howden Reservoir is Full
From Wiki Howden Reservoir is a Y-shaped reservoir, top one of the three in the Upper Derwent Valley, England. The western half of the reservoir lies in…
The River Derwent flowing into Howden A catchment Reservoir.
The River Derwent flowing into Howden
A catchment Reservoir.