A Brief History of the Derwent Valley Dams 1898 to 1970
Information extracted by AI
Here is the chronological breakdown of the specific historical dates and milestones.
19th Century Foundation
* Session of 1898–99: The Corporations of Derby, Leicester, and Sheffield each promoted separate Parliamentary Bills to construct reservoirs in the upper Derwent and Ashop valleys.
* 9th August 1899: The Derwent Valley Water Act 1899 received the Royal Assent, establishing the joint Derwent Valley Water Board.
The First Instalment (Howden & Derwent)
* July 1901: First excavation work commenced for the construction of the Howden Dam.
* July 1902: Excavation work commenced for the construction of the Derwent Dam.
* 1908: The Board initiated its long-term systematic afforestation scheme.
* 1909: Population of Birchinlee temporary workers' village reached its maximum of nearly 1,000 people.
* 5th September 1912: Howden Reservoir was formally opened by Chairman Sir Edward Fraser, and the original slow sand filtration plant at Bamford was brought into use.
* 1916: The Derwent Reservoir was completed and brought into active use.
The Second Instalment (Ashop & Alport)
* 1920: The Board obtained legal powers via the Derwent Valley Water Act 1920 to divert the rivers Ashop and Alport, and to substitute unbuilt 1899 reservoirs with the Ladybower Reservoir scheme.
* 1921: Diverting infrastructure construction officially started.
* 1929: Mechanical pressure filters at the Yorkshire Bridge Filter House were commissioned.
* 1930: The Ashop and Alport diversions were completed, raising the daily water yield to 20.064 million gallons.
The Third Instalment (Ladybower Reservoir)
* 1935: Construction officially commenced on the massive clay-core earthwork [Ladybower Dam].
* 1942–1944: Rapid gravity filter beds were built at Bamford to fully replace the original 1912 slow sand filtration system.
* 18th March 1943: Reservoir filling began when Chairman Alderman Sir Albert Atkey closed the main outlet valve.
* 25th September 1945: King George VI formally inaugurated the Ladybower Reservoir scheme.
Post-War Catchment Additions
* 1944–1956: The Board obtained statutory powers to abstract supplementary water from the River Noe, Peakshole Water, and Bradwell Brook
* 18th April 1951: The River Noe Diversion works were officially inaugurated by Chairman Alderman John Clark.
* 7th July 1960: The Castleton and Bradwell Limestone Scheme was formally inaugurated by Alderman Mark Henig
* 1961: Construction of the Central Stores Depot and Workshops on Main Road, Bamford was completed.## Modern Administrative Adjustments
* 1st April 1962: The maximum aggregate volume allocated to Derbyshire local authorities was increased to 7.22 million gallons per day.
* 1961 & 1962 Statutory Orders: The South Derbyshire Water Board and North Derbyshire Water Board were created, absorbing local authority distribution rights.
* September 1963: The Board initiated planning reviews to completely modernize and expand the overloaded 33 m.g.d. filtration infrastructure.
* 1963: The Water Resources Act 1963 came into operation, replacing historical allocation rights with a new annual license system.
* 1965: Formal legal authorization was granted to expand final treated water capability up to 42 m.g.d..
* End of 1966: Structural construction started on the automated New Chemical Treatment Block and associated Contact Tank.
* 1st January 1970: The Derwent Valley Water Order 1969 came into force, reallocating standard bulk supply limits among the modern region's water authorities.
* 31st December 1970: Final statistical cutoff point detailing a total historical capital expenditure of £9,893,939, a 2,002-acre dedicated plantation footprint, and an annual delivery total of 17,915 million gallons across the calendar year.
Howden Reservoir
* Dam Type: Solid masonry.
* Storage Capacity: 2,050 million gallons.
* Dam Height: 117 feet.
* Dam Length: 1,080 feet.
* Water Surface Area: 157 acres.
* Catchment Area: 9,321 acres.
Derwent Reservoir
* Dam Type: Solid masonry.
* Storage Capacity: 2,120 million gallons.
* Dam Height: 114 feet.
* Dam Length: 1,110 feet.
* Water Surface Area: 183 acres.
* Catchment Area: 3,899 acres.
Ladybower
* Dam Type: Clay-core earthwork.
* Storage Capacity: 6,310 million gallons.
* Dam Height: 135 feet.
* Dam Length: 1,250 feet.
* Water Surface Area: 504 acres.
* Catchment Area: 31,622 acres.
A Brief History